The Richland Avenue bridge and tunnel is relatively new and was put into place to improve the campus flow with students passing under Richland through a new tunnel rather than having to walk across the street. Reasons for the improvement were cited as a campus safety measure. Egress and ingress are all considered and first responder access to a particular area of campus.
Construction on a university campus is a continual process. Facilities have a in-service life span that requires renovation or replacement. Its also in the interest of the economy to award construction dollars especially in and around Ohio where construction opportunities are limited. It makes sense to be trotting out 60 to 70 million dollars in construction dollars per year for a campus Ohio's size.
Going back to the McDavis administration what was said is they wanted to take care of academics first meaning upgrading the science buildings and the new medical school building. Extras for athletics sans the Sook Center which was already funded by the end of the McDavis regime were supposed to be down the road. Pandemic of course has thrown a wrench into the university budget but with it stabilizing construction projects are moving forward again. Dorm renovations and the current administration has said they want to plan for a second building on the medical campus.
As it relates to the basketball practice facility. With the planned changes in the NCAA to modify the scholarship allotments and require additional sports I do not see how a BPF does not get built because additional locker rooms will be required. Practice courts and it makes sense to include an all sport weight room ,injury rehab facilities, training table, nutrition center there with it along with a Convo museum. That would of course free up space and scheduling over at Peden for those activities to use by the football program.
Planning for new facilities is still dicey yet though with the specter of the pandemic and inflation. A recession in the construction industry with demand destruction on material prices might save the university some money and make sense for the university to move more projects forward.
Most Memorable Bobcat Events Attended
2010 97-83 win over Georgetown in NCAA 1st round
2012 45-13 victory over ULM in the Independence Bowl
2015 34-3 drubbing of Fiami @ Peden with 25,086 fans
2023 10-7 near shutout of Iowa State @ Solich Field
2025 17-10 defeat of WVU @ Peden in front of 26,740